Open the Scale workspace to choose a supported lane, inspect quota, and issue one explicit PRISM command. The dashboard controls and values here are not submitted.

Workload
Scale Proof · pinned server-owned scenario
Submission
A second explicit action in Scale submits the run and creates an audit record.
Quota / cost
The live page shows configured public compute allowance. No monetary cost is exposed by this deployment.
Availability
Live execution depends on the gateway deployment; recorded-only deployments remain safely unavailable.
Open Scale workspace
AB
NavigateTransition Management
Reference transition draft

TRANSITION MANAGEMENT

Move legacy positions toward a target portfolio with tax-aware sequencing.

ReferenceReference transition pathDeterministic local plan
Assets transitioning$2.5MLocal reference scope
Estimated transition tax cost$61.2KLocal reference estimate
Planned turnover12.4%Reference path
Proposed phases4 phasesLocal reference sequencing
Illustrative sequence

TRANSITION GLIDE PATH

Target allocationCurrent allocation
Selected phase
Phase 1 · 0–3 months
Expected realized tax cost
$12,850
Turnover in phase
3.6%
Cumulative expected tax cost$61,240
Reference position inventory

POSITION BUCKETS

93 positions
PreserveHold in all phases
$1.6M65.2%
54positions
Trim laterReduce over time
$540.0K21.8%
18positions
Immediate exitSell in early phases
$186.0K7.5%
9positions
Replacement basketAdd in later phases
$138.0K5.5%
12positions
Total$2.5M93 positions
Reference six-position view

PHASED ACTION PLAN

Reference sequencing
Illustrative phased action plan. Expand a row for a concise reference rationale.
Ticker / SleeveCategoryRecommended phaseRationaleEst. tax costImpact on TEDetails
AAPLTechnologyTrim laterPhase 2 (3–6 mo)Reduce overweight vs. target; realize gains efficiently.$4,820+0.08%
NVDATechnologyTrim laterPhase 3 (6–9 mo)High unrealized gain; manage tax bracket.$8,610+0.05%
VTICore EquityPreserveAll phasesCore beta exposure; low turnover.0.00%
TLTFixed IncomeTrim laterPhase 2 (3–6 mo)Reduce duration bias aligned to target.$1,240+0.03%
ARKKThematic EquityImmediate exitPhase 1 (0–3 mo)High TE and overcapacity; exit early.$2,950+0.11%
AVUVUS Small Cap ValueReplacement basketPhase 3 (6–9 mo)Add to improve factor balance.−0.04%

Scroll horizontally to view all action-plan fields

Local draft constraints

TRANSITION CONSTRAINTS

Never submits a run
Respect wash-sale rules
Minimize market impact
All draft constraints satisfiedLocal reference-plan evaluation
Illustrative local plan

TRANSITION PLAN SUMMARY

Reference only
  • Plan spread over 12 months
  • Total realized tax cost $61,240
  • Average turnover per phase 3.1%
  • Tracking error stays within 1.05% reference path
  • Completion horizon: 12 months
Reference plan readySolved locally in 1.42 s

Data source & provenance

Reference

This product page is a local reference scenario. Its controls do not submit a solver run or an order.

Page
Transition Management
As of
2026-08-15T12:00:00.000Z
Source
PRISM dashboard reference composition; not a measured result or return forecast